top of page
001 Rivugonia.png

Current situation

A good part of the façade is resolved in steel and glass, following the style of the Nordic and American office buildings of the time. This type of enclosure generates energy losses that are out of date with current regulations. The steel pillars cross the entire façade, giving rise to thermal bridges that, according to the study of the façade module, meant very high losses, not to mention that the biggest factor that determines these changes is the windows, since having a transmittance of 5.7, the losses of this façade module represent 700 W.

01.2 Cremallera.png
Sistema_Cremallera_Conca_Llobregat.jpg
Ubicación_Estrategia_Conca_Llobregat.jpg
Isla_de_Bellamo.png
Sección_Urbanística_Llobregat.png
Prototipo_Aplicado_Conca_del_Llobregat.jpg

Rehabilitation of the ETSEIB   (4th course)

This building is the "Higher Technical School of Industrial Engineering", built in 1964 and designed by the architect Robert Terradas. Located in Barcelona, university area

  • Whatsapp
  • Instagram
  • LinkedIn

@2023 Josep Carulla. All rights reserved

bottom of page