top of page
Marseille-Aerial.jpg

chosen place

1-lugar-elegido.jpg

Why have we chosen it?

Present
Intention
2-actualidad-vs-intención.jpg

local opportunities

3-oportunidades-del-lugar.jpg

disused bridge

Tracks and containers

2.4 km of track

Access 1

Residential area

Residential area

Residential area

Access 2

Neighborhood without facilities

4-oportunidades2.jpg

quiet environment

Military base + industrial area

grand esplanade to

5 meters high

Connection to the city with 2.4 km of track

Reusable stuff. Containers, tracks and wooden planks

Access points at a new height of 5 meters 

New park and abundant vegetation

Lack of shops in the neighborhood

Needs

Strategy

Achieve a home for a long period 

of time

Reuse pre-existing elements to materialize the project and reduce costs

Reduce the waiting time to obtain

European documentation (1 year)

Adapt to the place according to its properties

Learn the language to integrate

Incorporate premises for collective use

Alternative temporary education for the schooling of infants

Set different degrees of privacy and social interaction (filters)

Integration to the city socializing with the natives of the city

Dynamize the end of the VIA-PARQUE route

Possibility of the arrival of more relatives in the future

Connect the neighborhoods by proposing an attractive place with strategic accesses

Equipment for sports and educational activities

Incorporation of commercial premises

Places to intervene

6-lugares-a-intervenir.jpg

"Interior courtyard" with a 5m difference in level that gives access to the park

yard invasion

Creation of a point of commercial influx

Connection of the park to a neighborhood without nearby green areas

Point with views of the patio and connected to the pre-existing parking

"staple"

to the ground

Containers and track

concrete pavement

without taking advantage

"Staples" invasion strategy

7-Estrategia-de-invasión.jpg

Foundations and structure

Placement of containers

Court 

containers

Enclosures and finishes

Result

final

Extensions

flexible

proposed plant

8 planta tipo.png

Commerce - Park

Park - Residences

Children's playground, since small children do not understand borders, we give a real option to integration

Sports courts, team sports generate relationship

Contrast PB and P1

9-constraste-abajo-arriba.jpg

Commercial space

Elevation 0m

 

Influx from nearby neighborhoods

residential space

Height 5m

 

Park

Plant

Short

Plant

high

project perspective

10-perspectiva-del-resultado.jpg

project section

11-Secciones-del-lugar.jpg

Space

residential

Space

commercial

Plant and section "Staples"

12-Planta-y-Sección-Grapas.jpg

atmospheres

13-Atmósferas.jpg

1 Private

6 Public

Flexibility of the "Staples"

14-Vivienda-ampliable.jpg

Due to the fact that when Syrian refugees arrive in Europe they spread the word among their families, we propose the very common possibility that their relatives also undertake that trip, consequently we propose a flexible housing model

Model 1/50 "Staples"

15-Maqueta-1-50.jpg

Model 1/100 Place

16-Maqueta-1-100.jpg

Project views

17-Render-1.jpg
18-Render-2.jpg

Operation Marseille  (2nd run)

We find ourselves in 2016, faced with the exodus of the inhabitants of Syria, Europe finds itself in a great humanitarian challenge. Welcome and integrate these educated and educated refugees in their cities. This project seeks to find a place of opportunity and reuse in Marseille, one of the main doors to Europe to respond to this demand.

  • Whatsapp
  • Instagram
  • LinkedIn

@2023 Josep Carulla. All rights reserved

bottom of page