top of page
Pre-existing situation

Planning




Integration of the proposal

Continuities
Public transport

Public space


S3
S4


S2
S1
Sun study


Winter solstice (12/21) 12 pm
Winter solstice (12/21) 5 pm


Winter solstice (06/21) 12 pm
Summer solstice (06/21) 17 pm
Buildability

Project Phases


PHASE 2

PHASE 4

PHASE 5

PHASE 6
Reparcelling in La Verneda (4th race)
We are in the neighborhood of "el Bon Pastor" this place where we operate has a certain peculiarity, which is that the block is separated by the limit of two municipalities, Barcelona and Sant Adrià. This, for practical purposes of reality, has caused that the intervention is only carried out in the section that remains within Barcelona, since it is an exercise, we will intervene in the entire area.
bottom of page